Construction Photos
 

May '04
February '04
New Year '04
November '03
October '03
August '03
May '03
November '02
August '02
April '02
January '02

Our Favorites


Here are a few of our favorite pictures of the construction process.  More of the pictures from each of the visits can be seen from the links to the left.

May '04

Saloon and Galley are complete, waiting for carpet at the last minute.

May '04

The Helm is all functioning. Stidd helm chairs will be installed after all the workers are off the ship.

May '04

The Settee behind the helm chairs will provide a great place to enjoy the ride or gahter for the view while at anchor.

May '04

The Master Stateroom with the king size bed and lots of storage drawers around the room are visible in the mirror above the bed.

February '04

The mast has gone on and we have the lifeboat. Note that at low tide, she sits on her keels and the ice chunks are left on the ground from the tide that went out.

January '04

Anjumal at home for the final phase of fitting out.

January '04

Anjumal gets launched, at long last

November '03

MSR shower is tiled and fixtures in place. The green accent tile is gettin a lot of rave reviews.

November '03

The galley is finally nearly done. Granite, tile, and fixtures in place.

October '03

Eating and food preparation island separates the saloon from the galley.

October '03

Helm is getting equipment installed. Drawers and cabinets are all in place.

August '03

At the last minute we decided to go for a more extensive fairing job. The results are visible here, prior to painting.

August '03

Sherry in her new galley. The Sub-zero and GE Advantium are installed

August '03

The king bed and furniture (pre doors) is installed and ready for the final touches.

May '03

The aft cockpit is starting to invite us aboard. The patch like colors are the spot fairing.

May '03

Port stateroom (Mallory's) is assembled and waiting for the counter top.

May '03

Well at least we're done below the waterline. Here is the rudder, Z-drive, and hull bottom.

November '02

She is really taking shape, now. See the Z-drive in place.

November '02

The lighter shade here is the portion remaining to sandblast and re-prime. It still shows the temporary primer.

November '02

Anjumal has been outside for sandblasting and priming. Almost done.

November '02 est - Spacious engine room

This picture of Romance's engine room construction is approximately how Anjumal's engine room looks in November 2002.

August '02

Anjumal is looking like our ship now from the stern. You can see the completed flybridge up top. If you look carefully, you can see the insulated interior wall.

August '02

The steel work is completed. This view from the bow shows the completed hull. In a week or two, Anjumal will be rolled out into the yard for sand blasting and 4 coats of zinc based primer.

July '02

Romances foredeck at the stage Anjumal is in July 2002.

May '02 - Flybridge

Hull 14 gets here flybridge a few months ahead of Anjumal

March '02

I love looking at this picture.

January '02

The engine room is ready for equipment. The large hole is for the z-drive.

January '02

plating nearing completion. It sure looks big from here.

January '02

plating is nearing completion

August '01 - Flared Bow

Notice the size of the ready to attach flared bow section compared to the front loader bucket and truck in this picture

August '01 - Ready to go bulkheads

This pile of parts is Anjumal. The bulkheads have been welded and are ready to assemble.

May '01 - Laying of the keel

In this steel ship, the 3" x 18" x65' solid steel keel forms the base of the construction.

When the time comes

Anjumal will be rolled down this ramp and out into the Bay of Fundy.

 